Carmanah R829-E 설치 매뉴얼 - 페이지 11

{카테고리_이름} Carmanah R829-E에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Carmanah R829-E 20 페이지. Traffic beacon
Carmanah R829-E에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (20 페이지), 에너지 관리 시스템 교체 매뉴얼 (12 페이지)

Carmanah R829-E 설치 매뉴얼
• Obtain 3" of red wire supplied with the kit and strip both ends to 0.35".
• Insert one end of 3" red wire into PBS+ terminal.
• Route modified AI harness wires (from Steps 2 – 5, violet, blue, black, red and yellow)
into the hole shown.
• Install the wires into the terminals as follows:
9
Violet →
3-position splice terminal with red wire going to PBS+
Blue
EXT1
Red
Middle BAT+
Black →
Middle BAT−
If the system has a push
button, insert the positive
push button wire into the
empty position of the 3-
position splice terminal.
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 | [email protected] | carmanah.com
Install AI Harness
Blue
(EXT1)
(PBS+)
Violet and
red (splice
terminal
• Align ends of heatshrink on both harnesses near end of
sheet metal tab.
10
• Cable tie around both harnesses and sheet metal tab.
APPLIED INFORMATION (AI) INTEGRATION KIT INSTALL GUIDE
Red
Red
(BAT+)
E/F Series
Black
(BAT−)
Page 11