Aleo ELEGANTE 설치 매뉴얼 - 페이지 10

{카테고리_이름} Aleo ELEGANTE에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aleo ELEGANTE 16 페이지. Bipv modules
Aleo ELEGANTE에 대해서도 마찬가지입니다: 설치 매뉴얼 (14 페이지)

10
the manufacturing warranty if you remove and mount
with approved tools in the proper way and according
to the connector manufacturer's instructions.

8 .6 Cables

Only solar cables with an 4mm2 cross-section and
appropriate connectors may be used for connecting
the modules.

8 . 7 Laying the string cables

Pay attention to bend the cables after they exit from
the connector, in order to keep them waterproof at
the cable outlet.
Figure 8E
This keeps the cables waterproof at the cable outlet.
Protect cables from direct sunlight, precipitation
and dirt.
Figure 8F
Cables from module strings are laid as near to each
other as possible to minimise the effects of being
struck by lightning.

9 Maintenance

Inspect and maintain your system to:
• keep it safe and reliable
• achieve top output
• prevent damages
• protect your investment
9 . 1

Review

aleo solar recommends carrying out a thorough review
at least every 4 years. This includes the following work
in addition to the inspection:
RECOMMENDATION
aleo solar explicitly recommends annual inspections
and a more thorough inspection and measurement
every 4 years.
We also recommend the use of a monitoring system
to identify any outages or problems quickly. Inspecting
the output of your photovoltaic system regularly can
help to discover problems promptly, and ensures your
photovoltaic system operates at top performance,
preventing loss of output.
aleo solar GmbH | Marius-Eriksen-Straße 1 | 17291 Prenzlau | Germany | [email protected]
Installation Manual GG Elegante Rel. 1.5, 01/2022, EN
Copyright © 2021 aleo solar GmbH
8D
cable coupler
cable coupler
plus
blind plug
8E
8F
minus