Elektra Beckum SKN 50 운영 및 유지보수 지침 매뉴얼 - 페이지 6
{카테고리_이름} Elektra Beckum SKN 50에 대한 운영 및 유지보수 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Elektra Beckum SKN 50 8 페이지. Elektra beckum finish nailer operating and maintenance instructions
Elektra Beckum SKN 50에 대해서도 마찬가지입니다: (사용자 및 유지 관리 매뉴얼 (8 페이지)
Your choices for lubrication:
a) by mist oiler
A complete service unit
includes a mist oiler and is
fitted at the compressor.
5.2 Trouble shooting
Faults and possible causes
O-rings damages or soiled.
Working pressure too low.
Cross section of air hose too small.
Tool not lubricated.
C. Fasteners are driven too far into the material:
Working pressure too high.
Tool not held down firmly enough.
Nail strip jams and will not advance fully
forward.
b) by line oiler
A line oiler is installed on the
tool's air inlet, which provides
the necessary oil for lubri-
cation.
A. Air escapes between lid and housing:
B. Fasteners are not driven all the way in:
D. Fasteners project or are bend:
E. Driver jammed with nail strip
c) manual lubrication
If neither a service unit nor a
line oiler exists in the pres-
surised air system, 3 -5 drops
of pneumatic oil must be
given into the air inlet before
each use.
Store air tools in dry
rooms only.
Remedy
Clean or replace O-rings, tighten
screws fully..
Increase air pressure in 0.5 bar
increments, until fasteners are
properly driven.
Min. 6 mm inner diameter required.
Clean parts and lubricate.
Reduce working pressure in steps
of 0.5 bar.
Hold down tool more firmly or increase
working pressure, if necessary.
Open bayonet lock. Remove jammed
nails and properly load suitable
nails.