ATTIAS USA-60 설치 및 운영 - 페이지 3

{카테고리_이름} ATTIAS USA-60에 대한 설치 및 운영을 온라인으로 검색하거나 PDF를 다운로드하세요. ATTIAS USA-60 11 페이지. Commercial dough mixers

UNPACKING
Immediately after unpacking the mixer, check for possible damage. If this machine is
found to be damaged after unpacking, save the packaging material and contact the
carrier with in 15 days of delivery.
Prior to installation, test your local electrical service to assure that it agrees with the
specifications on the machine plate. Call Attias with any questions.
LOCATION
Place the mixer in its operating location. There should be adequate space around the
mixer for the user to operate the controls and install and remove bowls. The area above
the mixer should allow the top cover to be removed for routine maintenance and
servicing.

CHECK LUBRICATION BEFORE USE

This mixer is shipped with oil in the transmission and planetary. Check oil levels before
starting mixer. Refer to LUBRICATION, for applicable lubrication procedures.

ELECTRICAL CONNECTIONS

WARNING: ELECTRICAL AND GROUNDING CONNECTIONS MUST
COMPLY WITH THE APPLICABLE PORTION OF THE NATIONAL
ELECTRICAL CODE AND/OR OTHER LOCAL ELECTRICAL CODES.
WARNING: DISCONNECT ELECTRICAL POWER SUPPLY AND PLACE A
TAG AT THE DISCONNECT SWITCH INDICATING THAT YOU ARE
WORKING ON THE CIRCUIT.
Model
Volt/Hz/Ph
USA60
208/220/240
USA80
208/220/240

INSTALLATION

ELECTRICAL DATA
Phase
Single or 3 Phase
*available in 50 cycles for overseas*
Single or 3 Phase
*available in 50 cycles for overseas*
Cycle