Dancover COMMERCIAL TITAN Peak 240 8.82m2 매뉴얼 - 페이지 10

{카테고리_이름} Dancover COMMERCIAL TITAN Peak 240 8.82m2에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dancover COMMERCIAL TITAN Peak 240 8.82m2 16 페이지.

Manual
INSTALLATION SEQUENCE
STAGE 5
End section installation
In the variant of
installation of the
greenhouse without a
foundation, marking
of axes is made on the
ground in accordance
with fig. 5.1 and holes
70 cm deep are dug for
foundation stay braces
with supports.
In the variant of
installation of the
greenhouse on a
foundation in accordance
with fig. 5.1, cleater
angles are mounted to
the foundation for the
subsequent fastening on
them bottom ends of arcs
in accordance with fig.
5.2 without foundation
stay braces.
The end section is lifted
and placed in a vertical
position on the prepared
place.
200*
100
45
Fig. 5.2
16
fig. 5.1
5000
200*
INSTALLATION SEQUENCE
STAGE 6
Extension of the frame
length.
Assembled power arc (or
Next power arc is joined
other end wall, depending
to the power arc that has
on the needed length
already been connected,
of the greenhouse) is
and so on all the arcs are
brought to the assembled
alternatively joined
end section at the
distance of the main
runner and joined to
it with the use of main
runners 2 and 2н align
the side flanges of shapes
(fig. 6).
It is recommended to
connect the outermost
and middle runners first,
using a stepladder.
Fig. 6
Manual
4
5
17