Dancover COMMERCIAL TITAN Peak 240 8.82m2 매뉴얼 - 페이지 12
{카테고리_이름} Dancover COMMERCIAL TITAN Peak 240 8.82m2에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dancover COMMERCIAL TITAN Peak 240 8.82m2 16 페이지.
Manual
GATE ASSEMBLY
STAGE 8
Installation of covering
Install honeycomb polycarbonate with a specified side facing outwards
(sunward); this side has a covering layer (make sure to clarify it on
buying or prior to installation). Covering layer is usually placed on the
side with notations on the shipping film. The film is transparent on the
opposite side of a sheet. After marking the sheet but prior to cutting
it, mark the side with the covering layer on each piece of the sheet:
when the shipping film is removed sheet sides look the same. Shipping
film shall be removed from the both sides immediately before fastening
covering on the frame.
Cut the sheets using a fret saw or a fine-pitch arm saw.
20
fig. 7.1
Arrangement of
angles for fastening
of polycarbonate on
the gate.
CUTTING LIST OF COVERING OF AN END
CUT POLYCARBONATE SHEET IN STRICT ADHERENCE TO FIG. 10.3
Honeycomb polycarbonate sheet size 2100 х 12000 MM
fig. 8.1
Cutting list of covering for an end of the
greenhouse 5.0 m wide.
140
1170
140
1330
remainder
2100
Manual
2000
980
3000
2000
980
3000
1330
remainder
2100
21