Dancover COMMERCIAL TITAN Peak 240 8.82m2 Manual - Page 12

Browse online or download pdf Manual for Greenhouse Kit Dancover COMMERCIAL TITAN Peak 240 8.82m2. Dancover COMMERCIAL TITAN Peak 240 8.82m2 16 pages.

Manual
GATE ASSEMBLY
STAGE 8
Installation of covering
Install honeycomb polycarbonate with a specified side facing outwards
(sunward); this side has a covering layer (make sure to clarify it on
buying or prior to installation). Covering layer is usually placed on the
side with notations on the shipping film. The film is transparent on the
opposite side of a sheet. After marking the sheet but prior to cutting
it, mark the side with the covering layer on each piece of the sheet:
when the shipping film is removed sheet sides look the same. Shipping
film shall be removed from the both sides immediately before fastening
covering on the frame.
Cut the sheets using a fret saw or a fine-pitch arm saw.
20
fig. 7.1
Arrangement of
angles for fastening
of polycarbonate on
the gate.
CUTTING LIST OF COVERING OF AN END
CUT POLYCARBONATE SHEET IN STRICT ADHERENCE TO FIG. 10.3
Honeycomb polycarbonate sheet size 2100 х 12000 MM
fig. 8.1
Cutting list of covering for an end of the
greenhouse 5.0 m wide.
140
1170
140
1330
remainder
2100
Manual
2000
980
3000
2000
980
3000
1330
remainder
2100
21