Cascade E Series 설치 지침 매뉴얼 - 페이지 5
{카테고리_이름} Cascade E Series에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cascade E Series 11 페이지. Push/pull and carpet pole removal and installation
Cascade E Series에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (14 페이지), 설치 지침 매뉴얼 (12 페이지), 설치 지침 (2 페이지), 운영자 매뉴얼 (20 페이지)
I
NSTALLATION
3
Prepare Hoses
A
Determine hose lengths required for hydraulic
supply configuration of truck.
B
Cut hoses to length, install end fittings.
Sideshift Left
Sideshift Right
Sideshifting – Double Hose Reels
Sideshifting with Solenoid – IHR and Cable Reel
Non-Sideshifting – Single Hose Reel
212115 Rev. 0
Open
Clamp
CL0246.ill
SSL / Open
(TANK port)
SSR / Clamp
(PRESSURE port)
Solenoid
Cable
CL0107.ill
Open
Clamp
CL0295.ill
IMPORTANT: Main valve options include LH or RH
CLAMP/OPEN porting, or dual porting which allows
hoses to be plumbed to either side of the Clamp to
match existing truck hydraulic supply configurations.
Sideshifting – Double Internal Hose Reeving
Sideshifting with Solenoid – 6-N-1 Cable/Hose Reel
4
Flush hydraulic supply hoses
A
Install hoses using union fittings.
B
Operate auxiliary valves for 30 sec.
C
Remove union
fittings.
CL0104.ill
CL0245.ill
3