AEV FRONT SKID RAM HEAVY DUTY 설치 매뉴얼 - 페이지 5
{카테고리_이름} AEV FRONT SKID RAM HEAVY DUTY에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AEV FRONT SKID RAM HEAVY DUTY 5 페이지.
3.
Lift the Closeout Plate into place and loosely install the two M10 x 35 carriage bolts through the
closeout bracket and the bottom of the compatibility beam brackets. Use two of the supplied M10
flange nuts to secure the bolts (fig. 6).
4.
Install the ten supplied M10 x 25 hex head bolts, M10 washers, and M10 flange nuts into front and back
sides of the Closeout Plate. It is recommended to start at the center and work outward. Tool access is
provided using the slots on the bottom of the plate.
5.
Torque the four nuts at the frame rails to 118 lb.-ft
6.
Torque all of the M10 nuts to 43 lb.-ft
A M E R I C A N
E X P E D I T I O N
Figure 7: View from above
V E H I C L E S
Figure 6
3