AEV FRONT SKID RAM HEAVY DUTY Instrukcja instalacji - Strona 5

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Akcesoria samochodowe AEV FRONT SKID RAM HEAVY DUTY. AEV FRONT SKID RAM HEAVY DUTY 5 stron.

3.
Lift the Closeout Plate into place and loosely install the two M10 x 35 carriage bolts through the
closeout bracket and the bottom of the compatibility beam brackets. Use two of the supplied M10
flange nuts to secure the bolts (fig. 6).
4.
Install the ten supplied M10 x 25 hex head bolts, M10 washers, and M10 flange nuts into front and back
sides of the Closeout Plate. It is recommended to start at the center and work outward. Tool access is
provided using the slots on the bottom of the plate.
5.
Torque the four nuts at the frame rails to 118 lb.-ft
6.
Torque all of the M10 nuts to 43 lb.-ft
A M E R I C A N
E X P E D I T I O N
Figure 7: View from above
V E H I C L E S
Figure 6
3