Duratuf SL1520 조립 지침 매뉴얼 - 페이지 14
{카테고리_이름} Duratuf SL1520에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Duratuf SL1520 16 페이지.
SECURING SHED
TIMBER PEGS—WOODEN FLOOR
• The optional Duratuf Timber Peg Down Kit includes six H5 treated timber
pegs that can be hammered into the ground and then attached to the
Base Plate with stainless steel screws. A Sentry timber floor can then be
fitted on top of the Base Plate if required.
BOLT DOWN KIT—CONCRETE
• The optional Duratuf Bolt Down Kit includes 6 x galvanised
brackets, screws and dynabolts.
• Space the brackets evenly around the shed and fix to the Bottom
Plate and the concrete slab. A 10mm masonry drill bit is required.
FITTING A SENTRY FLOOR KIT (OPTIONAL)
• Position the Floor Joists equally between the side Base
Plates and skew nail each end with two 75mm nails.
• Check that the shed is sitting level and square . Check
that the diagonal Bottom Plate measurements are the
same. This ensures that the shed base is square.
• Place the Floor Boards in position. (You may need to cut
the last Floor Board to the correct width using a Skill
Saw.) Nail each Floor Board in, using two 50mm nails
each end and two nails into each floor joist.
FIT PADBOLT
• Rivet Padbolt to door and keeper onto Door Jamb as
shown.
IMPORTANT— CLEAN UP
REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS THOROUGHLY. FAILURE TO DO THIS
WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY
YOUR DURATUF SENTRY SHED IS NOW COMPLETE. RELAX......
Secure your shed using Treated Timber Pegs or a Bolt Down Kit
13
BACK BASE PLATE
JOIST
JOIST
FRONT BASE PLATE
.