Data Signs PTL Remote 운영 및 유지보수 매뉴얼 - 페이지 9
{카테고리_이름} Data Signs PTL Remote에 대한 운영 및 유지보수 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Data Signs PTL Remote 19 페이지. Portable traffic lights
PLANT CROSSING MODE.
This can only be operated via the PTL Remote
Buttons used:
STOP
or GO
On start-up, both the Master and Slave will rest on Green signal phase for Plant-Crossing
Control until a demand for Red signal is entered by the operator.
The operator can enter a demand for Red signal using either STOP buttons on the Remote.
Both the Master and Slave units will then cycle to Yellow and the Red signal phase.
To change back to Green signal, either the Master: GO or Slave: GO button is pressed.
When the Red time has expired, the lights will cycle back to the Green signal. If the
Master: STOP or Slave: STOP button is pressed and the Green time has not expired, the
DEMAND LED will flash.
REMOTE
ACTIVE
Master / Slave Controller
For display use only
Plant-Crossing Control, Manual mode example:
1. Both the Master and Slave are on Green.
2. Either the Master: STOP or Slave: STOP buttons can be pressed on the PTL Remote.
3. If the Green time has expired both the Master and Slave will cycle immediately to
Yellow and then to Red. Otherwise - if the Green time has not expired - the DEMAND
LED's will flash.
4. Once the Green time has expired, the DEMAND LEDs will extinguish and the Master
and Slave will cycle to Yellow and then Red.
The REMOTE ACTIVE indicator lights up on both the Master and Slave controllers when a
button is pressed on the PTL Remote.
on PTL Remote.
P T L O P E R A T I O N S M A N U A L
PTL Remote Screen
9