Dataforth PWRM10-01 빠른 시작 매뉴얼 - 페이지 8
{카테고리_이름} Dataforth PWRM10-01에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dataforth PWRM10-01 20 페이지. Iot energy monitoring modules
MA1069 PWRM10-01 & PWRM20-01 Quick Start Guide
4.0 Installing the Module
Each PWRM10-01 and PWRM20-01 module is shipped in electro-static discharge (ESD) protective
packaging. Use appropriate ESD protection measures while unpacking. If physical damage is noted,
file a claim with the shipping carrier and contact the factory.
4.1 Mounting on a DIN Rail
ATTENTION
Read, understand, and follow all instructions in this manual and
Hardware User Manual
the product.
CAUTION – RISK OF ELECTRICAL SHOCK
When installing and operating the PWRM10-01 and PWRM20-01 modules, there is a potential shock
hazard from dangerous high voltage. Ensure systems are de-energized before installing the product
or removing the terminal blocks.
The PWRM10-01 and PWRM20-01 modules mount on 35mm DIN rails that are elevated or flush on
panels. They require no tools or hardware for insertion into a system and only a simple flat blade
screwdriver for removal.
To install a module:
1. Orient the module with the metal latch down and the Ethernet jack away from the DIN rail
2. Align the module DIN rail capture with the top edge of the rail
3. Slide the module down until the module engages the rail
4. Rotate the module and snap in place
Figure 1: PWRM10-01 Installation and Removal from a DIN Rail
Page 4 of 16
including all warnings, cautions, and precautions before installing and using
MA1068 PWRM10 & PWRM20-01