DUSTLESS BLASTING DB350 Mobile XS 빠른 매뉴얼 - 페이지 2
{카테고리_이름} DUSTLESS BLASTING DB350 Mobile XS에 대한 빠른 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DUSTLESS BLASTING DB350 Mobile XS 6 페이지. Flex cart start up & shut down
Flex Cart Start Up
Caution:
Make sure the machine is off and depressurized before completing the startup steps. The air-inlet
shutoff valve on the blast pot should be closed and the blow down valve should be open. Make sure the
caster wheels are set to the locked position. Use caution when transporting the cart.
1. Attach the blast hose to the pinch hose at the top of the blast pot and
insert the safety pins.
2. Screw on the appropriate blast hose nozzle. The nozzle size is based
on the air compressor/source size.
Caution:
The air cooler and dryer component of the machine can process up to 425 SCFM. Ensure proper SCFM
and operating temperature range, -30F to 175F are met before using the air cooling and drying system.
If operating in temperatures below 35F, ensure air is dry enough to avoid ice formation.
3. Connect the air supply source to the air inlet on the Flex Cart air cooling and drying system.
3a. If using accessory ports, connect applicable components to either the service ball-valve or the quick-
connect.
4. Connect the cart to the power source.
If using AC power source, the electrical requirements are 120v. Connect the power plug from the
•
power supply on the Flex Cart to the plug on your power source.
If using DC or battery power source, the electrical requirements are 12v. There is a separate cable
•
with alligator clips included with the cart. Plug this cord into the power supply on the cart. The
red clip on the cable will run to the positive terminal on the battery. The black clip will go to the
negative terminal on the battery.
AC power source connect
Quick-connect
Service ball-valve
Connect air source to
air inlet
2
DC power source connect