DUSTLESS BLASTING DB350 Mobile XS 빠른 매뉴얼 - 페이지 4

{카테고리_이름} DUSTLESS BLASTING DB350 Mobile XS에 대한 빠른 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DUSTLESS BLASTING DB350 Mobile XS 6 페이지. Flex cart start up & shut down

8. Turn on the compressor or other air source and let compressor idle for 10-15 seconds before allowing air
to flow freely to the Flex Cart. Slowly open the lever on the accessory ball valve if applicable.
Warning:
Follow all safety procedures listed in your blast pot user manual before, during, and after active
blasting. Operator must adhere to all recommended PPE and operating standards to prevent risk
of serious injury. Read and understand the Blast Pot Start Up section of the blast pot user manual
before operation.
9. Pressurize the blast pot. To do this, pull up on the abrasive lever to move the handle into the unlocked
position, close the blow down valve, and slowly open the air-inlet shutoff valve.
Blow Down Valve
10. Set the pressure regulator to 110 PSI. To adjust the operating pressure, see the blast pot user manual
section Adjusting Operating Pressure.
11. Start blasting.
Adjust abrasive lever to unlocked
position.
4
Air-Inlet Shutoff Valve
Pressure Regulator