Austa Austa-1P6002G 조립, 설치 및 작동 매뉴얼 - 페이지 7

{카테고리_이름} Austa Austa-1P6002G에 대한 조립, 설치 및 작동 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Austa Austa-1P6002G 13 페이지.

Step 4 – Ground the system
Each AU-1P600/8002G has an integrated ground protection circuit.The
grounding wire is through the trunk cable, and should be securely connected to
the groundconnector in the junction box.
Step 5 – Ground the system through racking (option)
AU-1P600/8002G may also be grounded through the racking as shown below.
08
Step 6 – Complete the connection map and connect the PV Modules
AU-1P600/8002G connection Map is a diagrammatic representation of the
physical location of each AU-1P600/8002G in your PV installation. The virtual
array in AUSTA micro inverter gateway AUG-256 is created from the map you
create.
Complete the connection map
Each AU-1P600/8002G has a removable serial number label located on the
mounting plate. Enter this serial number into the AUG-256, and correspond it to a
number in the connection map.

Connect the PV Modules

Completely install all AU-1P600/8002G and all system inter-wiring connections prior
to installing the PV modules.
1. Mount the PV modules above their corresponding AU-1P600/8002G. Each
AU-1P600/8002G comes with two oppositely sexed DC connectors.
2. First connect the positive DC wire from the PV module to the negatively marked
DC connector (male pin) of the AU-1P600/8002G. Then connect the negative DC
wire from the PV module to the positively marked DC connector (female socket)
of the AU-1P600/8002G. Repeat for all remaining PV modules using one
AU-1P600/8002G for each module.
09