{카테고리_이름} AFCO 175 Series에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. AFCO 175 Series 4 페이지. Level cable rail

Series 175
Series 175 AFCO
Series 175 AFCO
INSTALLATION INSTRUCTIONS
PARTS INCLUDED:
TOP RAIL—TOP RAIL (1)
A
(2)
SADDLE BRACKET
C
SUPPORT BLOCK CONNECTOR
G
TOOLS REQUIRED:
Drill bit
" (.156")
5/32
Drill Bit 9/32" (.281)
Drill bit 29/64" (.453)
1/8" hex wrench
7/16" wrench
Drill (with adjustable clutch, recommended)
Miter Saw (with metal cutting blade)
Level
Rubber mallet
Tape measure
Cable cutters
Grinder with cutoff wheel
Touch-up paint
FOR A SUCCESSFUL INSTALLATION:
Read the instructions completely before beginning the installation.
Plan your railing project. Sketch your project with the actual measurements of your deck or balcony
complete with post locations.
Check local building codes to ensure compliance.
Check carton(s) to determine part count is complete.
After cutting rails, balusters, or posts, paint exposed metal for maximum protection against the elements.
Installation is best accomplished with two people.
Wear personal protection equipment; safety glasses, etc.
Use care not to over-torque the screws. Pre-drilling is recommended.
Provided hardware to install AFCO-Rail is for use with Aluminum AFCO-Rail posts. If installing to other
surfaces the installer must acquire the appropriate hardware as needed for proper installation.
AFCO–
Level Cable Rail
Level Cable Rail
Level Cable Rail
(2)
BRACKET COVER
D
(2)
#10
1"
X
SELF DRILLING SCREW
H
H
BOTTOM RAIL— BOTTOM RAIL (1)
B D
(2)
BOTTOM BRACKET
E
3 1/2 "
(1)
(12)
DRIVER BIT
I
-
PRE
DRILLED CABLE BALUSTER
K
NOTES:
NOTE: Cables for this rail system are sold
separately.
Posts packaged separately.
An Optional AFCO-Tool is available to simplify the
locating, pre-drilling and installation of
brackets.
10"
(1)
SUPPORT BLOCK
F
(1)
ADHESIVE TAB SHEET
J