BENDIX AD-IS - 매뉴얼
{카테고리_이름} BENDIX AD-IS -에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. BENDIX AD-IS - 17 페이지. Air dryer and reservoir system
BENDIX AD-IS -에 대해서도 마찬가지입니다: 브로셔 (2 페이지), 서비스 데이터 (15 페이지)
- 1. Air Dryer/Reservoir System Charge Cycle
- 2. Air Dryer/Reservoir System Purge Cycle
- 3. Charge Cycle
- 4. Purge Cycle
- 5. Preventive Maintenance
- 6. Operation & Leakage Tests
- 7. Pressure Protection Valve Locations
- 8. Testing
- 9. Braking System Protection & Inspection
- 10. Temporary Air Dryer/Reservoir System Bypass
- 11. Delivery Check Valve Cleaning Procedure
- 12. Cleaning and Inspection
- 13. Troubleshooting
®
Bendix
®
AD-IS
®
PRESSURE
PROTECTION
22
VALVES (4)
SEC
DELIVERY TO
SECONDARY
RESERVOIR
PURGE
RESERVOIR
UNL
GOVERNOR
UNLOADER (2)
GOVERNOR
EXH
GOVERNOR
EXHAUST
®
FIGURE 1 - AD-IS
AIR DRYER AND RESERVOIR SYSTEM
DESCRIPTION
The function of the Integrated Solution Air Dryer (AD-IS
and Reservoir System is to provide heavy vehicles with an
integrated vehicle air dryer, purge reservoir, governor and a
number of the charging valve components in a module.
These have been designed as an integrated air supply
system.
The AD-IS
®
air dryer and reservoir system collects and
removes air system contaminants in solid, liquid and vapor
form before they enter the brake system. It provides clean,
dry air to the components of the brake system which
increases the life of the system and reduces maintenance
costs. The necessity for daily manual draining of the
reservoirs is eliminated.
Air Dryer and Reservoir System
RES
GOVERNOR
RESERVOIR (2)
21
PRI
DELIVERY TO
PRIMARY
RESERVOIR
PURGE VALVE
®
AD-IS
AIR DRYER
SUPPLY FROM
PART NUMBER
COMPRESSOR
STAMPED HERE
DESICCANT
CARTRIDGE
SAFETY VALVE
MOUNTING
BOLTS (3)
HEATER /
THERMOSTAT
1
IN
Air
Connection
Port ID
®
)
1
IN
21
PRI
22
SEC
24
AUX 1
23
AUX 2
UNL
RES
EXH
TABLE 1 - PORT DESIGNATIONS
PRESSURE PROTECTION
DELIVERY PORTS
VALVES (4)
Function/Connection
Inlet Port (air in).
Delivery Port out (to Primary reservoir)
Delivery Port out (to Secondary reservoir)
Auxiliary Delivery Port (air out).
Auxiliary Delivery Port (air out).
Unloader Control Air (D-2A
™
Common Reservoir Pressure
(D-2A
™
Governor)
Governor Exhaust
MOUNTING
HOLES - 4
23
AUX2
AUXILIARY
DELIVERY PORTS
(2)
24
AUX1
AUXILIARY
(4)
QTY
1
1
1
4
1
Governor)
2
2
1
1