HHO Plus CCPWM60A 설치 매뉴얼 - 페이지 10

{카테고리_이름} HHO Plus CCPWM60A에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. HHO Plus CCPWM60A 12 페이지. Hho hydrogen on demand dual fuel generator systems
HHO Plus CCPWM60A에 대해서도 마찬가지입니다: 설치 매뉴얼 (11 페이지), 설치 매뉴얼 (10 페이지), 설치 매뉴얼 (10 페이지)

HHO Plus CCPWM60A 설치 매뉴얼
CCPWM60A – Installation Manual
10
Car voltage 12,7 V --------> CCPWM will not work
In the configuration panel you can select the feature to edit using the left button (Down Arrow):
Once selected the feature you want to change value you need to press the right button (Edit) for more than 2
seconds in order to start flashing the number to edit. Use right button (Next) to move cursor to new number
and after to save (Save) your settings. In the last panel if you press left button (Exit) you work will not be
saved.
IMPORTANT: After having selected your voltage working limits you should test it
to check if it works correctly in your car. Stop engine and check if the CCPWM
shuts down. Start engine and check if CCPWM turns ON.
HHO Plus, Alternative Energies, Lta – Travessa das Serras 33, Vieira de Leiria, Portugal – Tel. 00351244697116 – Email: [email protected]