HI tecnologia P7C 연결 매뉴얼 - 페이지 4
{카테고리_이름} HI tecnologia P7C에 대한 연결 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. HI tecnologia P7C 8 페이지.
User Manual - P7C Controller
Humidity
Rack weight
Box
Protection Degree
Dimensions
Maximum number
Racks connection
The expansion racks must be connected to the right side of the main rack. In the case of adding
one expansion rack, it is necessary to remove the screw place at the main rack side (Picture A), and
loosen the two screws placed on the rack back side, in order to fit the (red) locks, as shown on the
picture (Picture B) and there the connection will be made. For that, approach both racks, in order
to fit the locks and connectors
shows.
IMPORTANT: Note the perfect racks connection: they must be aligned after the correct con-
nection. The incorrect connection may result in bad performance or damages to the product.
1 - Check the Notes and Acronysms List at the beggining of this document
Ref.: PMU107001
1
Picture A: Screw
Version: 1.0.07
≤90% without condensation
0,5 Kg
Aluminium and Carbon Steel
IP30
110 (W) x 110 (H) x 115 (P) mm
5 expansion racks
together. Push both screws (M3x4) to fix the two locks as Picture C
Picture C: Connection
Release: 10/20/10
Picture B: Locks / Screws
Technical Specifications
33