Great Lakes GLRR-1984 설치 지침 - 페이지 3
{카테고리_이름} Great Lakes GLRR-1984에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Lakes GLRR-1984 3 페이지. 19" two post relay rack
STEP #3:
Final tightening.
A. Stand rack upright.
B. Square unit using a
level or carpenter square.
C. Tighten all bolts using
socket or wrench.
STEP #4:
Secure rack to floor.
A. All racks should be
bolted to the floor, or to
an equally stabilizing
and secure surface, after
desired location is determined.
STEP #5: Equipment installation.
A. Your rack is now ready for installation of equipment and panels.
PARTS LIST: #GLRR-1984
ITEM NO.
1
2
3
4
5
6
TOOLS REQUIRED: ¾" Socket or Wrench and a level or carpenter square
© 2009 Great Lakes Case & Cabinet Co., Inc., All right reserved. All trade names are registered
trademarks of respective manufacturers listed.
GLRR-1984 INSTRUCTIONS
COMPONENT
Vertical Upright Channel
Base Angle
Top Angle
½"- 13 x 1 Hex Bolt
½" Lock Washer
#12-24 x ½"lg. Screws
QTY.
2
2
2
12
12
50
MS-5.02-11; REV 0