Great Lakes GLRR-1984 설치 지침 - 페이지 2

{카테고리_이름} Great Lakes GLRR-1984에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Lakes GLRR-1984 3 페이지. 19" two post relay rack

STEP #1:
Install top angles
to vertical upright
channels.
A. Lay vertical
upright channels
on edge so
tapped holes face
you and the floor.
Be sure open
sides of upright
channels face
each other.
B. Align holes
in top angle with
corresponding holes in vertical uprights. Formed leg of top angle
should be facing toward you.
C. Install 2 hex head bolts and lock washers. Finger tighten only.
D. Turn vertical upright assembly over (rotate 180 degrees) and
repeat steps B and C. Finger tighten only.
STEP #2:
Install base angles
to vertical upright
channels.
A. Leaving vertical
upright channels
on edge, align
holes in base with
corresponding holes
in each upright
channel. Long leg
of base should be
facing you.
B. Install 4 hex
head bolts and lock
washers. Finger tighten only.
C. Turn vertical upright assembly over (rotate 180 degrees) and
repeat steps A and B. Finger tighten only.