Great Lakes GLRR-1984 Einbauanleitung - Seite 2

Blättern Sie online oder laden Sie pdf Einbauanleitung für Racks & Ständer Great Lakes GLRR-1984 herunter. Great Lakes GLRR-1984 3 Seiten. 19" two post relay rack

STEP #1:
Install top angles
to vertical upright
channels.
A. Lay vertical
upright channels
on edge so
tapped holes face
you and the floor.
Be sure open
sides of upright
channels face
each other.
B. Align holes
in top angle with
corresponding holes in vertical uprights. Formed leg of top angle
should be facing toward you.
C. Install 2 hex head bolts and lock washers. Finger tighten only.
D. Turn vertical upright assembly over (rotate 180 degrees) and
repeat steps B and C. Finger tighten only.
STEP #2:
Install base angles
to vertical upright
channels.
A. Leaving vertical
upright channels
on edge, align
holes in base with
corresponding holes
in each upright
channel. Long leg
of base should be
facing you.
B. Install 4 hex
head bolts and lock
washers. Finger tighten only.
C. Turn vertical upright assembly over (rotate 180 degrees) and
repeat steps A and B. Finger tighten only.