Great Little Trading Alba L4472 매뉴얼 - 페이지 11
{카테고리_이름} Great Little Trading Alba L4472에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Little Trading Alba L4472 11 페이지. Corner base unit & top shelf
x12
#4
STEP 14:
IMPORTANT! Before the back panels are secured, please insert 2x cam locks (#3)
into the remaining holes on panel N. Turn clockwise to lock.
Take back panel P and align with the drill holes in the grooved edges of panels I & K.
Note the the positioning of panel P. At one end the drill holes are set further into
the panel. This end need to be at the corner join.
Secure with 12x domed head screws (#4).
Take back panel O and align with the drill holes
in the grooved edges of panels J & L.
Again, the holes on the panel that are set further
in should be at the corner join.
Secure with 12x domed head screws (#4).
x12
#4
N
Hardware for Step 15:
2x #3 Cam Locks
24x #4 Domed Head
Screws
#6
STEP 15:
Your Alba Corner Base Unit and Top Shelf are now fully built and ready to use with
an Alba CORNER Shelf unit.
Before you use your units, we strongly advise that you attach the anti-tip kit
(included) to the top shelf to secure this product to the wall.
Please use the pilot holes on the back edge of the top shelf (highlighted) to attach
the anti-tip brackets using the hardware included with the kit.
Please refer to the instructions in the kit
provided for further guidance.
Copyright© 2019 G.L.T.C. Ltd. All rights reserved.
11
Great Little Trading Company and GLTC are registered trade marks of G.L.T.C. Limited.
#6
Hardware for Step 16:
1x #6 Anti-Tip Kit