Hi-Velocity HE-B-52-WEG 설치 지침 매뉴얼 - 페이지 4
{카테고리_이름} Hi-Velocity HE-B-52-WEG에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Hi-Velocity HE-B-52-WEG 6 페이지. He-b-52 electrical box c/w weg variable speed drive
HE to HE-B-52 Air Handler Control Box Upgrade Installation
12. Now that the motor plug is connected, the control box
can be mounted in place of the large access door. (Figs. 12a,
12b)
13. Reconnect power & thermostat
connections to the new circuit board.
Hook up ground wire with the provided
wire nut. Refer to wiring diagram on last
page. (Figs. 13a-13c)
14. Double check that all wiring is done correctly according to wiring
diagram. Turn power back on and refer to wiring diagram or to page
30 of the HE-B Install Manual for instructions on how to set fan speed/
airflows. (Fig. 14)
15. After all fan speed/airflows have been set, the provided coverplate
can be screwed on with provided screws to cover the controls section
of box. (Figs. 15a, 15b)
Fig. 15a
16. With the cover plate secured, stick the provided wiring diagram sticker to the cover plate for future reference.
4
www.hi-velocity.com
Fig. 13a
Fig. 15b
-4-
Module HEB-52 WEG
Circuit Box Installation (4/6)
Fig. 12a
Fig. 13b
Fig. 14
Fig. 12b
Fig. 13c
© 1995-2022 Energy Saving Products Ltd.
© 1995-2022 Energy Saving Products Ltd.