Celec ES-30 현장 설치 매뉴얼 - 페이지 4

{카테고리_이름} Celec ES-30에 대한 현장 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Celec ES-30 10 페이지.

1. Un Pack the ES-30 from box using Plastic Strip Cutter & 17 No. Spanner.
2. Collect the Accessories as per the Packing Slip.
3. Remove any cardboard or thermocol packing inside the ES-30 given for support during
transportation.
4. Install the Load Break Switch handle on the door.
5. Do not use ES-30 in case of any Breakage or loose connections or Oil Spill inside.
CAUTION
Indoor Use Only, Type-1 Enclosure.
: -
1. Choose the dry and Clean Wall to Install the ES-30 taking care conduit connections from Bottom side
Enclosure Size is 760 x 600 x 210 mm and weight
2. Premark the Mounting holes on wall or structure.
3. Make a Drill of ɸ10mm up to the depth of 50mm for the wall plugs provided as Accessories.
4. Hang the Panel on wall plugs.
5. Tighten the wall plugs.
______________________________________________________________________________________
MOUNTING
kg (
ES-30
4
Pounds).