Automatic Solutions ASA 550L I 설치 및 유지 관리 매뉴얼 - 페이지 2

{카테고리_이름} Automatic Solutions ASA 550L I에 대한 설치 및 유지 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Automatic Solutions ASA 550L I 16 페이지. Sliding gate operators

Abbreviated Installation Instructions

Made in Australia from Australian & quality imported components
Place operator in correct position (Pinion wheel to be
parallel to the gate and stepped out to allow for width
of rack once it is mounted onto the gate frame). Mark
out fixings and fix operator to the concrete pad.
Once the rack is fixed move the gate and sight the
rack moving over the pinion wheel, check that most
of the pinion wheel meshes with the rack. Make sure
rack runs freely over the pinion wheel, any tights
spots should be corrected by adjusting the rack
height. Check the operator is firmly bolted down to
the concrete pad.
Connect required P.E Beams. Adjust Limits to
actuate prior to gate end positions. Connect Power
supply. Turn on Power.
(For those who don't have time!)
S l i d i n g G a t e O p e r a t o r s
ASA 550, 750 "L" Range
Fix rack to the gate frame keeping 1mm-2mm clearance
between the rack teeth and Pinion wheel
Ensure stops are installed on the gate for the fully closed
and fully open positions.