Celestica Athena Erp lot9 EcoDesign 매뉴얼 - 페이지 11
{카테고리_이름} Celestica Athena Erp lot9 EcoDesign에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Celestica Athena Erp lot9 EcoDesign 16 페이지.
The PCIE module
NOTE: The others which located on the rear of the enclosure assembly are similar to the section shows
below. Users could refer to the installation method as shown in the following chapters.
Type and number of fastenings:
Tools required: None.
Procedure:
1) Remove the controller canister cover, see
2) Remove the PCIE module out from the canister.
3) Remove the PCIE card from the slot.
Controller canister cover removal.
11