Celestica Athena Erp lot9 EcoDesign Manuel - Sayfa 11
Kontrolör Celestica Athena Erp lot9 EcoDesign için çevrimiçi göz atın veya pdf Manuel indirin. Celestica Athena Erp lot9 EcoDesign 16 sayfaları.
The PCIE module
NOTE: The others which located on the rear of the enclosure assembly are similar to the section shows
below. Users could refer to the installation method as shown in the following chapters.
Type and number of fastenings:
Tools required: None.
Procedure:
1) Remove the controller canister cover, see
2) Remove the PCIE module out from the canister.
3) Remove the PCIE card from the slot.
Controller canister cover removal.
11