GReddy Turbo Kit 설치 매뉴얼 - 페이지 9

{카테고리_이름} GReddy Turbo Kit에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. GReddy Turbo Kit 18 페이지. 96-98 nissan 240sx s14 (ka24de) td06-20g 8cm2
GReddy Turbo Kit에 대해서도 마찬가지입니다: 설치 매뉴얼 (13 페이지), 설치 매뉴얼 (18 페이지)

GReddy Turbo Kit 설치 매뉴얼
3. Turbo Kit Installation
3-1 Intake Manifold Plate Installation
1. Remove the extension manifold (upper).
Please refer to RX8 workshop manual pages
01-13-4 to 01-13-11.
*
Make sure to prevent any dirt or objects from
entering the intake manifold.
2. Install the Intake Manifold Blocking Plate onto
the manifold as shown in the picture.
3. Apply silicone gasket to the manifold surface
shown in the picture. Make sure the manifold
is clean before installing. You do not need to
apply silicone gasket to factory o rings.
Replace O rings if necessary.
4. Install extension manifold back onto intake
manifold. Refer to RX8 workshop manual.
3-2 Thermo Cloth Installation
1. Apply the provided Thermo Tape to the fire wall
around the exhaust manifold. (To secure the
Thermo Tape, Apply Aluminum tape on the
edges)
2. Bend and push the heat shield on the chassis
more against the body.
Caution!
It is very important to protect the parts surrounding the exhaust manifold and turbo from high
temperature. Improper installation of the thermo barrier may cause damage and fire.
(Parts Used #49)
(Parts Used #51)