Supply Cables
The supply input terminals are located toward
the top of the enclosure and consists of
Earth, Neutral, and Phase, all of which will
accept up to 10mm
cables should have a capacity of 40A, to
allow the device to be loaded to its maximum
capacity.
Load Cables
Load cables can be terminated on the 8 way
Load terminal strip (one Phase and one
Neutral for each Channel), and an Earth link
located at the centre of the enclosure. These
connectors will accept up to 6mm
is important that an individual Output Circuit
is not overloaded.
load, and ensure that it is below the
maximum capacity of an individual channel,
which is 10A.
interference standards, the load neutral
cables must be individually connected to the
neutral terminals inside the cabinet. Never
use a common neutral at a remote location.
Load Control Cables
Load control cables can be terminated on the
2 x 4 way terminal strips located directly
above the Load terminals. The left terminal
block is the output for 0 to +10V, or DSI if
selected by software setup. Note that most
types of 1-10V HF Fluorescent Ballast control
wiring is polarity conscious. The + terminal of
the ballast connects to the left terminal block,
and the - terminal connects to the right
(common) terminal block. DSI ballasts are
not polarity conscious.
Emergency Lighting Connections
Connect emergency lighting circuit active to
the load side on the circuit breaker for the
relevant channel, as indicated by the labels
next to the circuit breakers. Do not remove
any cables that may already be terminated at
this location.
Energising the Device
If it is necessary to energise load circuits
before any control cables are connected, it
is acceptable to replace the cover and
energise the device immediately, as the
default factory programming is to have all
channels set to 100% output. If there is no
output on any or all channels, see the
Troubleshooting section (page 8).
device should be de energised before
terminating the control and data cables.
2
cables.
Calculate the intended
To ensure compliance with
DBC410 Installation Manual Rev K.docx
The supply
2
cables. It
The
5