Galiso LDD-4 설치/운영 매뉴얼 - 페이지 7

{카테고리_이름} Galiso LDD-4에 대한 설치/운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galiso LDD-4 10 페이지. Light duty dryer

5.0 OPERATION

A. Galiso, Inc. recommends a warm up time of approximately 2 minutes at the start-
up of the machine. Switch the Power Switch to the HEAT position. After the warm
up, the Power Switch can remain in the HEAT position, or be switched to COOL
or OFF
B. Check that the cylinders are emptied and drained of water.
C. Invert drained cylinder and place upside down with a manifold outlet inserted into
the cylinder neck.
D. When cylinders have been loaded, flip the Power Switch to the HEAT or COOL
position.
E. After cylinders have been drying for a short time (5-10 minutes), check each
cylinder for dryness, and replace on the dryer if necessary or, load the next
cylinder.
NOTE: Cylinder dry times can vary, depending on the size and/or material.
Galiso, Inc. recommends using the COOL setting for composite cylinders.
The dryer can remain "On" when changing out cylinders but
the operator should be careful to avoid touching the Manifold
Frame, as it may be hot.
F. To shut down at the end of the day, flip the Power Switch to "COOL" for
approximately 2 minutes for the unit to cool down before flipping to the "OFF"
position.

6.0 MAINTENANCE

A. No regular maintenance is required except to check the air filter on top of the
muffler at least once a month and replace if needed.
Section 4 – 1
! CAUTION !
Avoid bending or otherwise damaging the tube.
! CAUTION !
21-11-1027