DYNAVAC NovaDryer-DHF400 빠른 설치 및 운영 매뉴얼 - 페이지 13

{카테고리_이름} DYNAVAC NovaDryer-DHF400에 대한 빠른 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DYNAVAC NovaDryer-DHF400 17 페이지. Vacuum freeze dryer

3.Temperature‐keeping (maintaining) Stage. Set keeping time 999 min, keep temperature 30℃. 
4.After finishing FORMULA setting, return to Monitoring Menu (Main Interface) , press "OPERATION".
i. Choose control mode (Program Control or Vacuum Control). Refer to procedure above on the previous page for setting.
ii. Load materials into the chamber, close the door, check if the inflation/drain valve is closed tightly and vacuum pump
tube is connected properly.
iii. Press "Start'. The system begins freeze drying process.
iv. After automatic program running is finished, Rotate the vacuum /water draining valve to the open position, then
open the door and unload the freeze dried materials.
Open Position 
www.dynapumps.com.au • 1300 788 579 • [email protected]