Galvin Engineering 102.22.11.00 설치 매뉴얼 - 페이지 2

{카테고리_이름} Galvin Engineering 102.22.11.00에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering 102.22.11.00 5 페이지.

Product Installation Guidelines

TOOLS REQUIRED

Power drill, spanner, hex key
Thread tape
DIMENSIONS-

MOUNTING DETAILS

Wall Spud
− Wall spuds must be 15BSP MI and protrude from the finished wall by no more than 15mm
Note: In some situations, a male thread connection on the tap may be more suited. If so, please contact
us on 1300 514 074.
165
© Galvin Engineering Pty Ltd
150
SERVICEABLE
INLINE FILTER
ISOLATION
VALVE
225
Version 1, 16 August 2023, Page 2 of 5
Document No.: 001.00.10.31
75
1/2" BSP FI