Galvin Engineering 102.22.11.00 Installation Manuallines - Page 2

Browse online or download pdf Installation Manuallines for Plumbing Product Galvin Engineering 102.22.11.00. Galvin Engineering 102.22.11.00 5 pages.

Product Installation Guidelines

TOOLS REQUIRED

Power drill, spanner, hex key
Thread tape
DIMENSIONS-

MOUNTING DETAILS

Wall Spud
− Wall spuds must be 15BSP MI and protrude from the finished wall by no more than 15mm
Note: In some situations, a male thread connection on the tap may be more suited. If so, please contact
us on 1300 514 074.
165
© Galvin Engineering Pty Ltd
150
SERVICEABLE
INLINE FILTER
ISOLATION
VALVE
225
Version 1, 16 August 2023, Page 2 of 5
Document No.: 001.00.10.31
75
1/2" BSP FI