Galvin Engineering Ezy-Drink Lead Safe SS316 설치 매뉴얼 - 페이지 2

{카테고리_이름} Galvin Engineering Ezy-Drink Lead Safe SS316에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering Ezy-Drink Lead Safe SS316 4 페이지. Remote push button drinking bubbler

Product Installation Guidelines
PRE-INSTALLATION -
If the mounting holes do not already exist, mark out and drill the holes in the bench/trough, as shown in
rough-in dimensions.
Note: Supplied flexi hose length is 225mm long. Maximum distance between outlet and handle is 180mm.
Note: Before installation, all lines must be flushed.
We recommend that a line strainer be installed prior to drinking taps to eliminate any foreign material
Rough-In Dimensions
*Only drill Ø2.5mm hole if anti-
rotation pin (not supplied) is
INSTALLATION
IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with
these provisions shall void the product warranty and may affect the performance of the product.
1. Disassembly
− Remove the push button handle using the
provided 2mm hex key to loosen the grub
screw.
− Remove the stainless steel lock nut using
an appropriate sized wrench. Do not
remove the top assembly.
Remove back nut and cup washer from the
outlet assembly.
© Galvin Engineering Pty Ltd
MOUNTING DETAILS
required.
2. Fit body & mouthguard outlet
Fit the valve body and mouthguard outlet into the
trough ensuring the rubber washers are placed
between.
Secure outlet underneath with the supplied cup
washer and back nut.
Secure valve body using the stainless steel locknut.
Take care not to over-tighten.
th
Version 4, 25
October 2022, Page 2 of 5