Galvin Engineering TCWBJ150C 제품 설치 - 페이지 3

{카테고리_이름} Galvin Engineering TCWBJ150C에 대한 제품 설치을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering TCWBJ150C 5 페이지. Cp-bs hospital wall bath set taps w/ 180 outlet lamina

Product Installation Guidelines

INSTALLATION

IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with
these provisions shall void the product warranty and may affect the performance of the product.
1. Fit O-ring
Before fitting spout to wall spud, ensure the
o-ring is in place as shown
3. Fit Spindle Assembly
Remove handle and flange from cartridge
assembly. Unscrew the ¼ turn ceramic
head part from the threaded sleeve
assembly and screw ceramic cartridge
into the valve body by hand, tighten using
a 17mm spanner.
Refit threaded sleeve and spindle.
The ¼ turn ceramic head part MUST be
fitted into the wall body prior to refitting
the threaded sleeve and spindle. DO
NOT tighten cartridge by using the
spindle or the threaded sleeve.
© Galvin Engineering Pty Ltd
2. Fit Spout
Screw spout clockwise onto wall spud as
shown.
Ensure thread tape is used.
4. Fit Wall Flange
Ensure o-ring is fitted to the bottom of the wall
flange, and then hand-tighten the wall flange
onto the threaded sleeve.
Document No.: 001.00.10.05
Version 1, 7 April 2022, Page 3 of 5