Galvin Engineering TCS9C150C 설치 매뉴얼 - 페이지 3

{카테고리_이름} Galvin Engineering TCS9C150C에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering TCS9C150C 7 페이지. Clinilever cp-bs hospital shower set w/ medi hand shower & 900 ss grab rail

Document No.: 001.00.10.16
Product Installation Guidelines
Version 1, 4 November 2022, Page 3 of 7
MOUNTING DETAILS – WALL TOP ASSEMBLY
Wall body
− Wall body must be G5/8" FI and body should be between
0 and 15mm behind the finished wall surface.
80/150 mm Wall Top Assembly
© Galvin Engineering Pty Ltd