Galvin Engineering TCS9C80C 설치 매뉴얼 - 페이지 6
{카테고리_이름} Galvin Engineering TCS9C80C에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering TCS9C80C 7 페이지. Clinilever cp-bs hospital shower set w/ medi hand shower & 900 ss grab rail
Product Installation Guidelines
INSTALLATION – WALL TOP ASSEMBLY
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions and
in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply
conditions must also comply to the applicable national and/or state standards. Failing to comply with these
provisions shall void the product warranty and may affect the performance of the product.
1. Fit spindle assembly
−
Remove handle and flange from cartridge
assembly. Unscrew the ¼ turn ceramic head part
from the threaded sleeve assembly and screw
ceramic cartridge into the valve body by hand,
tighten using a 17mm spanner.
−
Refit threaded sleeve and spindle.
− The ¼ turn ceramic head part MUST be fitted
into the wall body prior to refitting the
threaded sleeve and spindle. DO NOT tighten
cartridge by using the spindle or the threaded
sleeve.
3. Fit handle
−
Ensure the spindle is in the closed position
and firmly press the CliniLever
onto the spindle in the desired orientation.
−
Check operation of CliniLever
They should turn freely for a full ¼ turn.
−
Secure the handle in position using the
supplied washer and stainless steel cap
screw.
© Galvin Engineering Pty Ltd
2. Fit wall flange
4. Fit water temperature indicator & testing
®
lever handle
®
lever handle.
Version 1, 4 November 2022, Page 6 of 7
−
Ensure o-ring is fitted to the bottom of the wall
flange, and then hand-tighten the wall flange
onto the threaded sleeve.
−
®
Once CliniLever
lever handle is secure; fit the
appropriate water temperature indicator.
−
Once temperature indicator is fitted, check the
operation of the unit and inspect for any leaks.
Document No.: 001.00.10.16
Version 1, 4 November 2022, Page 6 of 7