Galvo Shed GVO 1508 조립 지침 매뉴얼 - 페이지 4
{카테고리_이름} Galvo Shed GVO 1508에 대한 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvo Shed GVO 1508 8 페이지. Sloping roof shed
STEP 3
FRONT WALL
Lay out the door with the sheet attached and the corner door jamb with the 'U' channel
attached (as shown below). Cap the sheets with the 1515mm channels
spacers
to make sure the door fits the gap (they sit on top of the 'Z' door jambs
F
Drill and fix the channels at every second rib down through the top.
Attach the door spacers at each end through the 'Z' door jambs and channels. Put three
fixings underneath through the channels into the sheeting pan and the top and bottom of
the door spacers and 'Z' door jambs (see diagram 1).
Fit the padbolt to the door strap on the outside of the door using wide flange
fixings or screws.
(We recommend you use an 8mm shackle diameter padlock on these pad
bolts, anything smaller may create security issues.)
PADLOCK KEEPER
ASSEMBLY
KEEPER
WASHER
RIVET
ADDITIONAL
INFORMATION
4
L
N
I
F
CHANNELS
The higher side of the channel goes to the
inside of the shed. It is very important to
include the fixings on the underside of all
the channels as they are structural (except
roof channels).
3
. Use the door
F
).
L
B
CHANNEL
Fix through the top and bottom of the channels into the door
jamb and spacer. The door jamb goes on inside of the channel.
OUTSIDE
If you choose to vary from these instructions your warranty will be impaired
YOU WILL NEED
F
2 x 1515mm 'U' channels
I
2 x 793mm door spacers
B
1 x 1830mm x 715mm sheet
L
'Z' door jambs (attached to B)
N
Padbolt
I
Channels will come short
of the ends of the sheeting by
SPACER
10-15mm on all panels.
GALVO TIP
To hinge the door on the opposite
side, simply put the top channel
on the bottom and the bottom on
the top.
Put the padbolt on the door
before erecting the panels. It will
stop the door swinging around!
INSIDE
F