Gree XK41 기술 제품 설명서 - 페이지 8
{카테고리_이름} Gree XK41에 대한 기술 제품 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Gree XK41 11 페이지. Command center for ductfree split systems
Gree XK41에 대해서도 마찬가지입니다: 소유자 매뉴얼 (19 페이지), 소유자 매뉴얼 (2 페이지)
INSTALLATION
The following is a brief XK-19 and XK-41 Wired Tether
Controller installation overview. See Wired Controller
Installation Manual for more detailed instructions on
installation, start-up, and setup.
Connecting Indoor Unit
Select a proper location on the wall for mounting
the Tether Controller. Install switch box, if required
by code. Locate the 26-ft communication cable that
came with the Tether Controller. Run communication
cable (as desired) between indoor unit and selected
wall mounting location. Locate the Tether Controller
connector in the control box area of the indoor unit.
Carefully connect communication cable to indoor unit.
Wired Tether Controller Installation
Pull communication cable through switch box (if
one is used) and Wired Tether Controller backplate.
Securely fasten backplate to the switch box or wall.
Carefully connect communication cable to rear of
Wired Tether Controller panel. Push extra cable into
wall and secure controller panel to backplate mounted
on the wall.
NOTE: Do not cut and splice communication cable.
Follow the start-up setup instructions supplied with
the Wired Tether Controller.
7