Centrometal EKO-CK P 25 기술 지침 - 페이지 7
{카테고리_이름} Centrometal EKO-CK P 25에 대한 기술 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Centrometal EKO-CK P 25 20 페이지. Hot water boiler
Centrometal EKO-CK P 25에 대해서도 마찬가지입니다: 사용 및 유지 관리 (20 페이지)
![Centrometal EKO-CK P 25 기술 지침](/uploads/products/server2/2046137/2046137.jpg)
The procces of converting factory delivered lower boiler door with right opening
direction (default) to door with left opening direction.
1. Removing door from boiler and remove universally parts from door
Unscrew two screws (5) and remove door from boiler. Strike out elastic pins and remove handle (1)
and hinge (2) from boiler door. Unscrew screw (8) and remove microswitch breaker (4).
2. Installing universally parts to the other side
2
Move handle (1) as shown in Figure and fasten it with elastic pin (6). Move hinge (2) as shown in
Figure and fasten it with 2 elastic pins (7). Move microswitch breaker (4) and fasten it with screw (8).
3. Installing of handle latch holder and door to boiler
Unscrew two screws (9) and take out handle latch holder (3). Put handle latch holder as shown
in Figure (must be rotated on position with slot up). Handle latch holder is always on the the
side wher is handle. Put door on the boiler and fasten it with screws (5).
Technical instructions EKO-CK P
8
4
6
1
Handle latch holder must be rotated
on position with slot up.
9
9
3
Changing of door opening direction
4
5
6
5
4
1
8
7
2
7
7
2
7
5
5
7