Gamma Progression STII 소유자 매뉴얼 - 페이지 10

{카테고리_이름} Gamma Progression STII에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gamma Progression STII 19 페이지.

Gamma Progression STII 소유자 매뉴얼
STRINGING THE FRAME
Pulling Tension
Wrap the loose section of string once around the
roller guide and insert the string between the
diamond dust coated string gripper plates. Pull
the string perpendicular to the gripper plates
while slowly rotating the tensioner crank clock-
wise until the brake lever pops out of the latching
block. The string is now tensioned and can be
clamped in place with the remaining fixed clamp.
Repeat the above steps until all main strings are
installed. Tie off ends of main strings as per
racquet manufacturers recommendations.
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fied by the racquet manufacturer.
9