Gamma X-2 소유자 매뉴얼 - 페이지 6

{카테고리_이름} Gamma X-2에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gamma X-2 11 페이지.
Gamma X-2에 대해서도 마찬가지입니다: 소유자 매뉴얼 (16 페이지)

Gamma X-2 소유자 매뉴얼

STRINGING THE FRAME

Setting Tension
The drop weight is of a two piece design.
When assembled, it will accomodate ten-
sions from 20 lbs. to 90 lbs. For tensions from
8 to 20 lbs., remove the 5mm bolt on the face
of the drop weight, and use the smaller
portion of the weight as described above.
Note: Tensions above 77lbs. require re-
moval of the drop weight bar endcap.
To set the stringing tension, loosen the lock-
ing knob on the side of the drop weight. Slide
the weight in the appropriate direction until
the face closest to the string gripper is
indexed with the desired tension mark on the
tension bar.
Starting the Main Strings
To begin stringing the main strings, count the
number of holes at the throat of the frame,
which will determine the starting point. For
racquets with 4 or 8 holes at the throat, the
main strings will begin at the head. For
racquets with 2 or 6 holes at the throat, the
main strings will begin at the throat.
Thread the two ends of the string through the
two center grommet holes at the head or
throat as determined in the previous step.
Route the strings through the opposite center holes.
5