Centurion SECTOR II 설치 매뉴얼 - 페이지 11

{카테고리_이름} Centurion SECTOR II에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Centurion SECTOR II 19 페이지. Rectangular boom pole jack-knife led

SECTION 3
9. Route the LED harness through
the 12mm hole, making sure that
the cable can reach the end of
the pole.
10. Stick the LED strip to the Jack-
knife boom pole by removing the
blue backing. Start from the side
nearest to the 12mm hole.
Only the backing should be
peeled off the LED strip.
Do not attach the LED strip
to the underside of the
boom pole, i.e. the surface
facing the ground, as doing
so will result in damage to
the LED's in the instance
where the pole collides with
a vehicle due to tailgating.
It is recommended that the
strip is attached to the side
of the boom pole that is
facing oncoming traffic.
If the LED strip needs to be
shortened, it can be cut at
the terminals indicated in
figure 14.
LED strip
LED terminals
LED
strip
page 11
PHYSICAL INSTALLATION
LED
harness
FIGURE 12
FIGURE 13
LED terminals
FIGURE 14
www.centsys.com