6 Installation and commissioning

ATTENTION

6.1 Wall mounting

ATTENTION
PrimoBox ACB 910 mixing unit for condensing boilers
The PrimoBox ACB mixing unit installation location must provide
weather protection. The ACB kit cannot not be installed outdoors.
The ACB mixing unit cannot be mounted on stands or placed directly
on the floor. If there is visible damage to the product, do not proceed
with installation.
Possible damage to existing installations
When drilling into walls, pay special attention not to damage
electric cables or other existing cables.
On the selected, straight wall, mark the places provided for the han-
dles so that they coincide with the holes in the back of the PrimoBox
ACB mixing unit. Drill holes in the wall and place the dowels (included
in the delivery) in them. Hang the module on the dowels. Then check
the correct leveling.
Possible need for other dowels
It is necessary to verify that the dowels provided are suitable
for the selected wall.
If the dowels provided are not suitable for the selected wall,
replace them with others.
Mounting the PrimoBox ACB unit on the improper dowels can
lead to its breaking off the wall!