Green Frog Designs Chicken Run 4x2 매뉴얼 - 페이지 13

{카테고리_이름} Green Frog Designs Chicken Run 4x2에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Green Frog Designs Chicken Run 4x2 17 페이지.

13
Place the partially completed Upper Hinge Assembly over
the top corner of the Door Frame (opposite corner from
the lock assembly), and add the second Door Hinge Side,
securing it with Pi Clips. This picture shows the top of the
door.
15
Hang the door using Clevis Pins and R-Clips on the two
inner holes on the Door Hinge Holders. The Lower Hinge
Holder will rest on the bottom bars, and support the
door.
Printed on recycled paper
14
Repeat steps 6 and 7 for the Lower Hinge Assembly.
Note the positions of the lugs on both hinge assemblies,
ready for hanging the door. The door is now complete,
except for the addition of mesh, which is best left until
after the frame is fully assembled and the door is hung.
16
The Door will need holding in place until it is attached
both top and bottom. The Upper Hinge Holder will need
to be slid upwards and held in position while the Clevis Pin
and R-Clip as fitted. Once attached, the door can be
closed and secured by the Door Catch.
© Green Frog Designs Limited 2016
Page 13 of 17