GREEN LOO CF 4 매뉴얼 - 페이지 5
{카테고리_이름} GREEN LOO CF 4에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. GREEN LOO CF 4 11 페이지. Dry composting toilet
1) Thread the drain elbow into the liquids outlet on the bottom of the unit. Ensure you finish with the
elbow pointing in the direction of the excess liquids drain.
2) Secure liquids drain hose onto elbow firmly and fasten with hose clamp. Position the bottom half of
the CF 4 into its final position.
3) Do not yet connect up with slotted aggregate pipe of the excess liquids trench.
4) Insert the drainage tray - spacer pipes at the bottom, and drain outlet service hole at the front.
5) Slide drain service pipe into the hole in the front left of the bottom tray, secure in place with
supplied bracket & screws and cap off (see below).
Cover floor tray with 50mm of supplied bulking material. Wet down with a spray hose.
Run a 4 - 6mm silicone bead around the center of the flange of the bottom unit (silicone and caulking gun
supplied).
Assemble the CF 4 container and add bulking material
5