GREEN LOO CF 4 매뉴얼 - 페이지 6

{카테고리_이름} GREEN LOO CF 4에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. GREEN LOO CF 4 11 페이지. Dry composting toilet

GREEN LOO CF 4 매뉴얼
6
Put top unit on top of the bottom unit as per below. Line up the holes of the flanges and fasten with bolts,
washers and nuts (supplied).
Affix the handle with bolts (both supplied) through the pre-drilled holes
Cutting the hole for the waste chute and cutting the chute to length
Cut the waste chute hole in the toilet room floor to suit chute - approx. 250mm (+/- 2mm).
Insert the chute from above, tapered end up, through the hole you cut earlier. Firmly rest the chute onto
the CF 4. Measure the distance between the floor and the floor stops of the chute. Remove the chute and
cut this measurement less 50mm off the bottom of the chute so that when re-inserted later, it will protrude
50mm into the CF 4 container.