GREEN LOO CF 4 Руководство - Страница 6
Просмотреть онлайн или скачать pdf Руководство для Туалеты GREEN LOO CF 4. GREEN LOO CF 4 11 страниц. Dry composting toilet
6
Put top unit on top of the bottom unit as per below. Line up the holes of the flanges and fasten with bolts,
washers and nuts (supplied).
Affix the handle with bolts (both supplied) through the pre-drilled holes
Cutting the hole for the waste chute and cutting the chute to length
Cut the waste chute hole in the toilet room floor to suit chute - approx. 250mm (+/- 2mm).
Insert the chute from above, tapered end up, through the hole you cut earlier. Firmly rest the chute onto
the CF 4. Measure the distance between the floor and the floor stops of the chute. Remove the chute and
cut this measurement less 50mm off the bottom of the chute so that when re-inserted later, it will protrude
50mm into the CF 4 container.